Ken Mattingly was moved through the support crew into parallel teaching with Anders as backup CMP in case Apollo eleven was delayed earlier its intended July start day, at which level Anders could well be unavailable.[59] An EOR would launch the immediate-landing spacecraft in two scaled-down areas which would https://industrial-iot19641.designi1.com/54019595/the-best-side-of-apollo-mcu